All Episodes - Page 5
Browse all 104 This Old House episode recaps with detailed project insights and expert tips. Showing episodes 37-45 of 104.

Dan and Jill's 1971 Walpole ranch kicks off Season 47's final project with a 900-square-foot ADU for Jill's parents. Tom Silva catches a garage foundation that came up ten inches short of local frost depth, Richard Trethewey stares down an oil boiler that has to serve two households, and Jenn Nawada plans a yard built for kids, grandparents, and one shared fire pit.

Nathan Gilbert measures and installs top-down, bottom-up cellular shades so Cece the guard dog can't see the street; Richard Trethewey walks Kevin through 150 years of toilet tank parts and running-toilet fixes; Jenn Nawada and Frank reshape a steep front slope with a mini excavator, a swale, switchgrass, and hydrangeas.

The Needham Victorian wraps on a 24-inch snow day. Charlie installs the mortise lockset Tom patched into the original front door, Kevin tours the open kitchen, mudroom, primary suite, and finished basement, and Richard explains why the old furnace stayed while attic foam and a new heat pump did the heavy lifting.

Mauro Henrique repaints a too-pink nursery and builds a two-arch accent wall with string, low-tack tape, and a fast wet rag; Jenn Nawada separates air-purifying pothos claims from citronella candles and root pruning; Mark McCullough sets a 16-by-14 pea stone patio with a retaining wall, drain pipe, binding agent, and a 72-hour cure.

In Needham, Charlie reinstalls the original china cabinet in the new dining room, Jaclyn walks through a powder room that survived three wallpaper rounds, Heath Eastman explains primary bath lighting and blocking, the ducts get cleaned after construction, and Tom Silva cuts a mortise into the original Southern yellow pine front door.

Nathan Gilbert and New Orleans carpenter Scot replace rotten Bywater shutters in Spanish cedar under historic-district rules, Jenn Nawada and Lee Gilliam decode NPK and organic versus synthetic fertilizer with Kevin, and Heath Eastman swaps battery detectors for interconnected hardwired smoke and CO alarms after a fire chief walks through placement.

Heath Eastman and tile installer Mike O'Neil lay electric floor heat under tile, Kevin tours a Chatham cabinet shop, Mauro repaints salvaged butler's pantry cabinets, and Tom boxes in ductwork behind built-in bookcases.

Richard Trethewey separates grease and hair clogs from chemical drain cleaners, Mauro Henrique compares at-home lead swabs with an XRF analyzer, and Mark McCullough sets granite treads into a New Hampshire slope so Pete can reach his fire pit without another tumble.

Mauro preps a porch ceiling with six color finalists, Jenn and Mark lay a running-bond brick paver patio on crusher run, Kevin tours a 200-year-old Tewksbury mill making rift-and-quartered white oak, and Charlie weaves salvaged Douglas fir into the second-floor hallway and linen closet.